Excavator at work in the G.P.R. Marmi quarry in Coreno Ausonio, at sunset
The Quarry

Five quarries.
One basin.

Our quarries lie within the Coreno Ausonio (FR) extraction basin, at the heart of the Perlato Royal deposit.

Aerial overview of the G.P.R. Marmi quarry in Coreno Ausonio
The quarry by numbers

An area of about 412,000 m².

The group owns five quarries in the Coreno Ausonio (FR) extraction basin, covering a total area of about 412,000 m². Extraction is handled by Tirreno Marmi Srl, the group company dedicated to this stage of the supply chain.

Extraction is carried out as open-pit mining, following the deposit's benches in the Perlato Royal basin, at the foot of the Aurunci Mountains. The extracted material is then processed by G.P.R. Marmi, which handles selection, crushing, and transformation into finished products.

5Own quarries
~412,000 m²Total area
The process

From drilling to the block.

Quarry operations are carried out by Tirreno Marmi Srl, the group company dedicated to extraction.

01

Survey and drilling

The rock bench is identified and drilled according to the quarry's extraction plans.

02

Block extraction

The block is separated from the bench and moved to the yard for selection.

03

Selection and transport

Each block is selected and transported for processing or sale.

Images

The quarry, in detail.

Want to know the materials we produce?

Discover our products